Description: Development of site at Eidgah Muradbagh drass Name of Work Development of site at Eidgah Muradbagh drass Under Capex
Details: Demolishing stone rubblemasonrymanually/bymechanicalmeans including stackingofserviceablematerialanddisposalofunserviceablematerialwithin50 metres lead as per direction of Engineer-in-charge : Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil 70% Ordinary rock 30% Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: as directed by Engineer-in-charge.
Sector: PWD