Details: earthwork in excavation by mechanical means in trenches for foundation, drians, pipes, cables etc., not exceeding 1.5m in width and for shafts wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed, within lead of 50meters all kind of soil ordinary earthwork in excavation by manual means in trenches for foundation, drians, pipes, cables etc., not exceeding 1.5m in width and for shafts wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed, within lead of 50meters all kind of soil ordinary providing laying and fitting of hdpe pipe conforming to is 4984 : 1995 with latest amendements and conveying to work site including loading and unloading at both destinations and ro
Sector: PWD