Details: earth work in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge. a)all kind of soil.70% b)ordinary rock:20% extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. a)all kinds of soil b)ordinary rock. providing and laying in position stone boulder (dully hand packed)including watering ,dressing and ramming . reinforced cement concrete work in beams, suspended floors, roofs having up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, fi
Sector: PWD