Description: Construction of Play field at Lamotoo Kharboo Phase II Name of Work Construction of Play field at Lamotoo Kharboo Phase II Under the scheme GIA for the year 2024 25 Block Bhimbat
Details: Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. :All kind of Soil: Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:3:6 (1cement :3coarse sand :6graded stone aggregate 20mm nominal size) Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement :6 coarses and:12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse s
Sector: RDPR