Details: earth work in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge all kinds of soil dumping stone including cost of stones in horizontal on level providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-iii) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and bin
Sector: PWD