Details: transportation of boreing equipment, machine tools to the new site of bore well fixing of complete camp by way of of equipment tools, accessories, attachment fixing of tent for labor and stacking of material at bore well site the. the job include leveling of ground, drilling machine and other charges on account of pol etc. for 1st shifting of boring machine and equipment. providing and fixing of suitable shoe 200mm dia having adequate thickness. drilling of bore hole with 225mm dia bit using odex method of drilling as per site condition conglomerate, boulders pebbles, clay etc including cost of m.s casing pipe consumable store, drilling bits pol etc, with the system of simultaneously lowering of 200mm dia id m.s casing pipe required thickness which shall be welded together. drilling of bore hole using dth method as per the site condition up to required depth in rocky strata. development of bore well wi
Sector: PWD