Description: Constt of office Building ALC Kargil phase 1 Name of Work Construction of Office Building ALC Kargil Phase 1St by way of Compond walling Ground Tilling And Other Allied works
Details: Excavation work in excavation by manual means in foundation trenches, drains, pipes and cables etc. (Not exceeding 1.5m in width or 10sqm on plane) including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus soils and directed, within a lead of 25 mtr. all kinds of soil. All kind of soil 60% Ordinary rock 30% Hard rock 10 % Providing & fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement motor 1:3(cement: 3 course sand) cost of required centering shuttering and finishing smooth with 6mm thick cement plaster 1:3(1cement:3 fine sand) on exposed surface complete 1:3:6(1cement:3 coarse sand :6 graded stone agg, 20mm nominal size including all sort of carriage compete. 15 mm thick cement plaster in cement in cement mortar 1:4 (1 cement:4 fine sand) including all sort of carriage
Sector: PWD