Description: Day to Day maintenance of building and allied works at Nyoma Sub Division Name of Work DAY TO DAY MAINTAINACE OF BUILDING AND ALLIED WORKS AT NYOMA SUB DIVISION
Details: Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil Dumping of solling stone in horizontal layer including cost of Stone complete job. Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Random rubble masonry with hard stone laid dry in foundation, plinth & walls Laid without bond stone Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand
Sector: PWD