Details: demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in mud mortar dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : of area beyond 3 sq. metres earth work in excavation by manual means in foundation trenches or drains (notexceeding 1.5 m in width or 10 sqm on plan), including dressing of sides andramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m all kinds of soil earth work in excavation by manual means in foundation trenches or drains (notexceeding 1.5 m in width or 10 sqm on plan), including dressing of sides andramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated s
Sector: RDPR