Description: Construction of Barkandu irrigation khul Lamsoo RD 0 120mtr Revival Name of Work Construction of Barkandu Irrigation khul Lamsoo RD 0 120 Mtr REVIVAL Under SDP
Details: Earth work in bulk excavation by manual means over areas (exceeding 30cm & up to 1.5mte in depth, 1.5mtr in width as well as 10sqm on plan) including Disposal of excavated earth up to 50 mtr from cutting edge, disposed earth to be leveled and neatly dressed. All kind of soil 80% Ordinary rock 10% Hard rock (RB) 10% Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 50 mtr from cutting edge, disposed earth to be leveled and neatly dressed in: All kind of soil 80% Ordinary rock 10% Hard rock (RB) 10% Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching us
Sector: PWD