Description: Completion of balance work for construction Remodeling of balance work of Thochay irrigation canal at Chiktan from RD 1250 1900mtr Name of Work Compelation of blance work for construction Remodeling of balance work of Thochay irrigation canal at Chiktan from RD 1250 1900 Mtr Under CAPEX
Details: Earth work in excavation by manual means in foundation trenches or drains (notexceeding 1.5 m in width or 10 sqm on plan), including dressing of sides andramming of bottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil 80% Ordinary rock 10% Hard rock (BP) 10% Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching using plum aggregate 20mm, volumetric batching using plum (size over 160mm, split nallah stone or quarry stone) @20% of gross volume upto plinth level excluding cost of form work and including curing complete.. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coa
Sector: PWD