Description: Construction restoration of Choskore Khul Wakha at Gonpa Lungma from RD 300 912mtr Name of Work Conastruction Restoration of Choskore khul Wakha at Gonpa Lungma from RD 300 912 Mtr Under CAPEX
Details: Earth work in excavation by manual means in foundation trenches or drains (notexceeding 1.5 m in width or 10 sqm on plan), including dressing of sides andramming of bottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of 50 m.. All kind of soil 85% Ordinary rock 10% Hard Rock (RB) 05% Dumping/filling of stone in horizontal on level including cost of stone Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size Nallah Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size Nallah Reinforced cement concrete work in beams, suspended floors, roofs having slo
Sector: PWD