Description: Maitenance of water supply scheme sakti chemray kharu hemis martselang shang changa igoo gya miru upshi rumtse shara sharnos and phuktsey in sub division hkaru II for the year 2025 2026 Name of Work Maitenance of water supply scheme sakti chemray kharu hemis martselang shang changa igoo gya miru upshi rumtse shara sharnos phuktsey in sub division Kharu II
Details: Earthwork in excavation by Manual means in trenches for foundation, drians, pipes, cables etc., not exceeding 1.5m in width and for shafts wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed, within lead of 50meters All kind of soil Earthwork in excavation by Mechanical means in trenches for foundation, drians, pipes, cables etc., not exceeding 1.5m in width and for shafts wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed, within lead of 50meters All kind of soil Dismantling manually /mechanically including stacking of serviceable material and disposal of un serviceable materials within 50mtr leads i) Bituminous road Dismantling manually /mechanically includ
Sector: PWD