Details: earth work in excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) includinggetting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, asdirected by engineer-in-charge. all kinds of soil dumping of stone including cost of stone in horizontal level. providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - all work up to plinth level :1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 gradedstone aggregate 40 mm nominal size derived from natural sources) random rubble masonry with hard stone in foundation and plinth includinglevelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 gradedstone aggregate 20 mm nominal size) upto plinth level with : cement mortar 1:6 (1 cement : 6 coarse sand) providing & fixing upto floor five level precast cement concrete solid blocks includinghoisting and
Sector: PWD