Details: demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge:in cement mortar. felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunk and branches removing the roots and stacking of serviceable material and disposal of unserviceable materia beyond 60 cm girth upto and including 120 cm girth. clearing jungle including uprooting orank vegetation grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of upto a distance of 50m outside the periphery of the area cleared. earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 s
Sector: PWD