Details: earthwork in excavation by mechanical means (hydraulic excavator ) overareas (exceeding 30cm in depth,1.5min width as wel las 10sqm on plan) including getting out and disposal ofexcavated earth lead upto 50m and liftup to 1.5m,as directed by engineer-in-charge, all kind of soil. earthwork in excavation by mechanical means (hydraulic excavator ) overareas (exceeding 30cm in depth,1.5min width as wel las 10sqm on plan) including getting out and disposal ofexcavated earth lead upto 50m and liftup to 1.5m,as directed by engineer-in-charge, hard rock (bp) earthwork in excavation by mechanical means in foundation trenches or drains (not exceeding1.5 min width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m, all kind of soil. earthwork in excavation by mechanical means in foundation trenches or drains (not exceeding1.5 min width or 10sqm o
Sector: RDPR