Details: demolishing brick work manually/ by mechanical means including stacking ofserviceable material and disposal of unserviceable material within 50 metres leadas per direction of engineer-in-charge. in cement mortar demolishing mud phaska in terracing and disposal of material within 50 metres lead. earthwork in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30cm in depth,1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m,as directed by engineer-in-charge.all kinds of soil (50%) ordinary rock (50%) earth work in excavation by mechanical means (hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil (50%) ordinary rock (50%) dry stone pit
Sector: RDPR