Details: earthwork in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30cm in depth,1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m,as directed by engineer-in-charge.all kinds of soil (90%) ordinary rock (10%) earth work in excavation by mechanical means (hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil (90%) ordinary rock (10%) dry stone pitching (any thickness) including cost of stones. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level 1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 graded stone aggre
Sector: RDPR