Description: Construction of Community Study Hall near Imambada Trespone Name of Work Construction of Community Study Hall near Imambada Trespone Under the scheme State Sector for the year 2024 25 Block TSG
Details: Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge, Plate form cutting.All kind of Soil: Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge, Plate form cuttingordinary Rock: Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge, Plate form cutting:Hard Rock (BP) Earth work in excavation by mechanical means (hydraulic excavator) in trenches f
Sector: RDPR