Details: dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge : earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-incharge. 2.6.1 all kinds of soil providing and laying of soling stone in bed of foundation with hand-packed excluding cost of stone carriage complete:- providing and laying cement concrete m 10 grade with 20 mm nominal size of stone aggregate including cost of centring and shuttering all work upto plinth level centering and shuttering including strutting, propping etc. and removal of form work for .retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth
Sector: RDPR