Description: Completion Of Balance Work for Construction Of 20 Nos Entry Gate In Zanskar Name of Work Completion Of Balance Work for Construction Of 20 Nos Entry Gate In Zanskar Under the scheme Capex for the year 2024 25 Block Zanaskar
Details: Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m, All kind of Soil: Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m, Ordinary Rock: Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m, Hard Rock (B.P): Providing and laying of
Sector: RDPR