Description: Constructuion Of Goat shed at Labas Tambis Name of Work Constructuion Of Goat shed at Labas Tambis Under the scheme GIA for the year 2024 25 Block TSG
Details: Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m, Hard Soil: Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, asdirected by Engineer-in-charge..Hard rock (BP): Providing and laying cement concrete in specified grade including curing but excluding the cost of centring, shuttering and finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Steel work in builtup tabular round , square or rectangular hoollow tube etc. in trusses, including cutting hoisting fixing in position and applying a priming coat of approv
Sector: RDPR