Description: Laying of plaster of approach wall and edge wall at RTO land Phyang Name of Work Laying of plaster of approach wall Edge wall at RTO land Phyang
Details: 15 mm cement plaster on the rough side of single or half brick wall of mix :1 1:4 (1 cement: 4 fine sand) Providing and laying Polished Granite stone flooring in required design andpatterns, in linear as well as curvilinear portions of the building all complete asper the architectural drawings with 18 mm thick stone slab over 20 mm (average)thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed withcement slurry and pointing with white cement slurry admixed with pigment ofmatching shade including rubbing , curing and polishing etc. all complete asspecified and as directed by the Engineer-in-Charge.Polished Granite stone slab of all colour and texture except Black, Cherry/Ruby Red Providng & fixing 12mm thick pre laminated flooring of approved brand as per direction of Engineer incharge complete job AC-4 Including carriage security room Earth work in excavation by mechanical means (Hydraulic excavator) infoundation trenches or drains (not exceeding 1.5
Sector: PWD