Description: Construction of safety channel or irrigation khul Bagh e Khumaini Name of Work Construction of Safety channel or Irrigation Khul Bagh e Khumaini Under CAPEX
Details: Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m All kind of soil 60% Ordinary rock 10% Hard Rock (RB) 30% Dumping /filling of stone in horizontal on level excluding cost of stone . Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 gradedstone aggregate 20 mm nominal size derived from natural sources) Crushed. Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching us
Sector: PWD