Details: demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer - in- charge. demolishing brickwork manually/by mechanical means including stacking of serviceable materia and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in cement mortar dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead dismantling woodwork inframes, trusses,purlins and rafters upto 10 metres span and 5 metres height including stacking the material within 50 metres lead of sectional area below 40 square centimetres pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like earthwork in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30cm in depth,1.5 m in width as well as 10 sqm
Sector: RDPR