Details: earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-incharge.a) all kinds of soil 70% b)ordinary rock:20% b)hard rock (blasting prohibited) 10% extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. a)all kinds of soil b)ordinary rock. providing and laying in position stone boulder (dully hand packed)including watering ,dressing and ramming . providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:4:8 (1 cement : 4 manufactured sand derived from recycled concrete aggregate (rca) : 8 graded stone aggregate 40 mm nominal size recycled aggregate (ra) reinforced cement concrete work in be
Sector: PWD