Details: earth work in excavation by manual means in foundation trenches or drains (notexceeding 1.5 m in width or 10 sqm on plan), including dressing of sides andramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. dumping stone including cost of stones. in horizontal on level providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand (zone-iii) derived from natural sources : 6 gradedstone aggregate 20 mm nominal size derived from natural sources) providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) reinforcement for r.c.c.
Sector: RDPR