Description: Balance work for Construction Remodeling of Irrigation Channel from Pashkum to Poyen Akchamal Platue Under CAPEX Name of Work Balance work for Construction Remodeling of Irrigation Channel from Pashkum to Poyen Akchamal Platue Under CAPEX
Details: Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 gradedstone aggregate 20 mm nominal size derived from natural sources) Crushed. Centring and shuttering including strutting propping etc,and removal of form work for Walls (any thickness) incld. attached pilasters, buttresses, plinth & string courses etc. incl. form work for suspended floor Foundations etc, Complete job Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished 40 mm thick with 20 mm nomi
Sector: PWD