Details: earthwork in excavation by mechanical means in trenches for foundation, drians, pipes, cables etc., not exceeding 1.5m in width and for shafts wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed, within lead of 50meters all kind of soil ordinary rock hard rock providing laying and fitting hdpe pipe conforming to is 4984 : 1995 with latest amendements and conveying to work site including loading and unloading at both destinations and rolling, lowering into the trenches, laying true to line and jointing of pipes and specials by electrofusion welding as per standard procedure and guidlines, including encasing the pipe around to a depth not less than 15 cms with soft earth or selected earth available from the excavation etc., complete giving hyduralic test as per relevant isi with all leads and lifts including testing commissi
Sector: PWD