Details: earth work in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge. a) all kinds of soil 65% b) ordinary rock 25% c) hard rock (requiring blasting )10% earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil dry stone pitching (any thickness) excluding cost of stones on horizontal dumping stone including cost of stone on horizontal level.(plum) dumping stone excluding cost of stone on horizontal level. dumping stone excluding cost of stones on slopes (behind pitching) providing and laying in position cement concrete
Sector: PWD