Description: Infrastructure Development at Lamstan School Choglamsar Under capex Name of Work INFRASTRUCTURE DEVELOPMENT AT LAMSTAN SCHOOL CHOGLAMSAR Adv cost 220 00lacacs Scheme DISTRICT CAPEX BUDGE Block LEH
Details: Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All Kind of soil Ordinary Rock Dumping stone including cost of stones.in Horizontal on level Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished 40 mm thick with 20 mm nominal size stone aggregate Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto p
Sector: RDPR