Details: earth work in excavation by manual means over areas (exceeding 30cm and up to 1.5mtr in depth, 1.5mtr in width as well as 10sqm on plan) including of excavated earth up to 1mtr cutting edge, disposed earth to be leveled and neatly dressed in: all kind of soil: providing and laying of soiling stone in bed of foundation with hand packed obtained from execution. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-all work up to plinth level 1:3:6 (1cement :3coarse sand :6graded stone aggregate 20mm nominal size) centering and shuttering including strutting propping etc,and removal of form work .walling carriage of sand aggregate by mt 18km and 300 mtr by h/l carriage of cement by mt 22km and 300 mtr by h/l providing and fixing of sign board(3’0’’x2’6’’)including angle iron stand,writing,painting complete job.
Sector: RDPR