Details: earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: all kind of soil 100% labour charges for repair and maintenance, removal of blockages of pipes and restoration of fhtcs as per the direciton of site engineer incharge including all carriage complete. hdpe pipe 125mm dia hdpe pipe 25mm dia hdpe pipe 20mm dia filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. layers not exceeding 20cm in depth, consolidation each deposited layer by ramming and watering lead up to 50mtr and left up to 1.5m. removal of mulba and silt form collection chamber and service reservoir including disposal and levelling of the same as per direction of site incharge. providing and fix
Sector: PWD