Details: earth work in excavation by manual means over areas (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposal ofexcavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in charge. all kind of soil 60% ordinary rock 10% hard rock (rb) 30% earth work in excavation by manual means in foundation trenches or drains (notexceeding 1.5 m in width or 10 sqm on plan), including dressing of sides andramming of bottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of 50 m. all kind of soil 60% ordinary rock 10% hard rock (rb) 30% providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - all work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-iii) derived from natural sources : 4 gradedstone aggregate 20 mm nominal size derived from natural sources)
Sector: PWD