Details: earth work in excavation by mechanical means (hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. earth work in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge. a) all kinds of soil 30% b) ordinary rock 30% c) hard rock (blasting prohibated) 40% dumping stone excluding cost of stones in horizontal on level dumping stone excluding cost of stones on slopes (behind pitching) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:4:8 (1
Sector: PWD