Details: earth work in excavation by manual means over areas (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposal ofexcavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-incharge.a. all kinds of soil 20%. b.ordinary soil 80%. constructing vertical bunds with sloping faces, by boulder filling (dry, hand packedtightly); including cost of stones but excluding cost of wirecrates making knitted wire crates of approved mesh-size; including weaving, bindingsides and partitions, and binding top after filling; excluding cost of filling, stonesand weaving materials carriage of material from source to site by mechanical transport. a. stone an avg lead 15km carriage of material from source to site by headload. a. stone an avg lead 500mtr supply of crate carriage complete job.
Sector: PWD