Description: Construction Of Compound Walling Ground Levelling And Toilet Local For CFC At Korzok Phase II Name of Work CONSTRUCTION OF COMPOUND WALLING GROUND LEVELLING AND TOILET LOCAL FOR CFC KORZOK PHASE 2nd Adv cost 25 82lacs Scheme SDP DEPTT 2024 25 Block RUPSHO
Details: Earth work in bulk excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge ALL KIND OF SOIL Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metresAll kind of soil Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead upto 50 m and lift upto1.5 m in -All kinds of soil. Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6
Sector: RDPR