Details: dumping stone on horizontal level including cost of stone . banking excavated earth in layers not exceeding 20cm in depth, breaking clods watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers and rolling every third and top-most layer with power roller of minimun 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, guide banks etc. lead upto 50 mtr. and lift upto 1.5 mtr. in : all kinds of soil.deduct for not rolling with power roller of min 8 tonne for banking excavated earth in layers not exceeding 20 em in depth. carriage of earth an avg lead of 30 km carriage of stone an avg lead of 30 km
Sector: RDPR