Details: earthwork in excavation by manual means overareas (exceeding 30cmindepth, 1.5 m in width as well as 10 sqm onplan) including getting out and disposal of excavated earth lead upto 50 mandliftupt 1.5m, as directed by engineer-incharge. all kinds of soil. stone soling hand packed. providing and laying in position specified grade of cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- all work up to plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforc
Sector: RDPR