Details: earth work in excavation by way of chiselling by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centring ,shuttering, finishing and reinforcement.1:11⁄2:3 (1 cement : 11⁄2 coarse sand : 3 graded stone aggregate 20 mm nominal size) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work up to plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20
Sector: RDPR