Details: demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge: in cement mortar taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 meters lead : of area of 3 sqm. and below dismantling wood work in frames, trusses, purlins and rafters upto 10 meters span and 5 meters height including stacking the material within 50 meters lead : of sectional area below 40 sqcm. dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of : g.s. sheet earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge all ki
Sector: PWD