Details: schedule - i- dismantling & reconstructing of western side jetty approach at kadmath:- phase idismantling of existing damaged concretes of slab, longitudinal beams, cross beams, hand rails, electric posts, low landings, screen walls, midtide beams etc and transporting the materials to the department stack yard as instructed by eic leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy machineries like concrete cutter, demolition hammer, breaker etc, cost of labours etc complete. rcc 1:0.9:1.80 using 20mm graded stone jelly for rcc pile cap mid tide bracings, short columns, diagonal bracings, stiffening walls, deck beams, and slab rcc slab or bollard blocks, low level landing platform etc., excluding fabrication charges which will be paid separately , including cost of cement, granite jelly, river sand, all labour charges for screening and washing of both the aggregates, providing all shuttering, including cost of shutt
Sector: Harbor