Details: schedule - i - katchery jettyscaffolding : providing two legged scaffolding using blue gum post or best quality bamboo post of 3m over length, the distance between two rows being 2m in both rows with to horizontal post including using longitudinal and transverses, middle braces to stop up and providing a platform using coil and nile with hand rails for safety measures including cost of all materials , all labour charges, minor tools etc complete. surface preparation to receive micro concrete by chipping to depth of max. 75mm, cleaning, removing the traces of dust, loose concrete etc., including cost of all labour charges, minor tools, etc, complete. providing and fixing tor steel reinforcement for r.c.c. work including cutting, bending, binding, and placing in position and lapping to be provided minimum of 20 cm in length by welding at both ends, including cost of steel cost of binding wire, minor tools etc. complete. supplying, preparing and priming the reinforcement steel with epoxy
Sector: Harbor