Details: dismantling of existing damaged concretes of slab, longitudinal beams, cross beams, hand rails, electric posts, low landings, screen walls, midtie beams etc and transporting the materials to the department stack yard as instructed by eic leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy mechinaries like concrete cutter, demolition hammer, breaker etc, cost of labours etc complete. r.c.c. 1:0.9:1.8 using 2 cm size jelly for pre-cast r.c.c. piles and for extending r.c.c. piles in situ, excluding cost of fabrication charges which will be paid separately but including cost of cement, stone chips, river sand, shuttering materials, all labour charges for screening and washing of both the aggregates providing all shuttering, centering toggle holes and lifting holes, mixing concrete conveying and placing, consolidation with , curing, all labour charges for fixing pile shoes, transportation charges and running expenses of
Sector: Harbor