Details: dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : of area beyond 3 sq. metres demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge: in cement mortar cement concrete block (machine moulded) masonry in superstructure above plinth leve lin cm 1:6 with blocks of size 40cmx20cmx15cm. supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. cement concrete with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete. reinforced cement concrete work in beams, suspended floors, roofs having up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above pl