Details: surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift up to 1.5 m. earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by engineer-in- charge: earth work excavation in foundation trenches or drains not exceeding 1.5m in width or 10 sq.m on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. earth work excavation in foundation trenches or drains not exceeding 1.5m in width or 10 sq.m on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. up to 1.50 metre (pie x0.7x0.7x
Sector: District Administration