Details: installation of channel marker buoy/ skirt keel buoys/ twin point mooring buoy removed from the channel before monsoon agathi including transporting the buoys and accessories from dept stack yard to installation point ,all labour charges minor tool, hire charges of boat, etc complete twin point mooring buoy kadmath bitra kiltan chetlath channel marker buoy kadmath buoy with in lead of 1km buoy above 1km lead bitra buoy with in lead of 1km buoy above 1km lead kiltan buoy with in lead of 1km buoy above 1km lead chetlath buoy with in lead of 1km buoy above 1km lead removal of channel marker buoy/ skert keel buoys/ twin point mooring buoy from installation position in the lagoon of agathi and bangaram and transporting the same to seashore and stacking dept yard properly as per direction of engineer in charge etc complete including cost of all labour charges minor tool, hire charges of boat etc complete(before monsoon during may 2025 twin point mooring buoy kadmath bitra kiltan
Sector: Harbor