Details: dismantling the damaged top slab & steps of the entrance tower including removing of the dismantled concrete exposing the m.s.rods and transporting the materials to the department stack yard as instructed by eic leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy mechinaries like concrete cutter, demolition hammer, breaker etc, cost of labours etc complete. providing & laying rcc 1:0.9:1.80 using 20mm graded stone agregate for entrance tower, steps and rcc slab etc., excluding fabrication charges which will be paid separately , including cost of cement, granite stone, river sand, all labour charges for screening and washing of both the aggregates, providing all shuttering, including cost of shuttering materials, centering, proping wherever required mixing concrete, conveying and placing consolidation with curing, and transportation charges of all other materials to work site, hire charges and running expenses of c
Sector: Harbor