Details: felling trees of girth (measured at height of 1 mtrs above ground level) including cutting of trenches, removing the roots and stacking of unserviciable materials. a) beyoned 30 cm & up to 60 cm in girth b) beyoned 60 cm and up to 120cm in girth surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift up to 1.5 m. all kinds of soil. earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in charge. all kinds of soil centering and shuttering including strutting, propping etc. and removal of form for all heights : foundations, footings, bases of columns, etc. for mass concrete providing and laying in position ready mixed or site batched design mix cement concrete for reinforced ce
Sector: District Administration