Description: Annual maintenance of Navigational Aids Twin point mooring Buoy and 5000 DWT mooring buoy at Kalpeni for the Year 2025 Name of Work Annual maintenance of Navigational aids Twin point mooring buoy at 5000 DWT mooring buoy at Kalpeni for the Year 2025
Details: Installation of channel marker buoy/ skert keel buoys/ twin point mooring buoy at lagoon channel of Kalpeni including transporting the buoys and accessories from dept stack yard to installation point including cost of all labour charges minor tool, hire charges of boat, etc complete (After monsoon during October 2025) Twin point Mooring Buoy Channel Marker Buoy Buoy with in lead of 1KM Buoy above 1KM lead Skirt keel buoy Removal of channel marker buoy/ skert keel buoys/ twin point mooring buoy from installation position in the lagoon of Kalpeni and transporting the same to seashore and stacking dept yard properly as per direction of engineer in charge etc complete including cost of all labour charges minor tool, hire charges of boat etc complete (before monsoon during May 2025) Twin point Mooring Buoy Channel Marker Buoy Buoy with in lead of 1KM Buoy above 1KM lead Skirt keel buoy Chipping, Scrapping and thoroughly cleaning the old steel surface with chipping hammer, scrapper etc; a
Sector: Harbor